₹26 crore bridge develops cracks within 96 hours of inauguration in Bihar
Traffic was stopped at a road overbridge after cracks were observed within 96 hours, or nearly four days, of its inauguration in Bihar's Buxar district. The bridge was built at a cost of ₹26.4 crore. This comes days after a man shared a video of a ₹549-crore bridge in Bihar showing a visible crack, sparking safety concerns.