2 months after launch, portion of Ganga e-way's exit road caves in after UP's 1st rain

A portion of Ganga Expressway's exit road caved in after first rain in UP's Unnao. The 594-km long expressway, built at a cost of ₹36,230 crore, was inaugurated by PM Narendra Modi on April 29. The seven-metre approach road developed a washout after rain on Friday, with soil along the embankment eroding. The stretch was repaired on an emergency basis.

Load More