7 engineers suspended over Bhopal's 90° railway overbridge reinstated

All seven PWD engineers who were suspended in 2025 over Bhopal’s 90° railway overbridge have now been reinstated. The engineers associated with the design wing reportedly did not admit to any negligence or error in their response to the department. However, a departmental inquiry will still go on against three of the engineers. The overbridge is currently being redesigned.

Load More