Bengaluru metro pink line's CMRS safety inspection from October 6

Bengaluru Metro’s Pink Line elevated stretch between Kalena Agrahara and Tavarekere is likely to undergo mandatory CMRS safety inspection from October 6 to 8. The 7.5-km corridor has six stations and could push the operational Metro network beyond 100 km after opening. Meanwhile, delays in Platform Screen Door supplies have affected the underground section.

Load More