BMRCL floats demolition tenders for Bengaluru Metro Phase 3
Bengaluru Metro Phase 3 has entered the preparatory stage, with BMRCL floating tenders to demolish buildings and structures along the proposed corridors. The packages cover multiple stretches to clear the alignment for construction work. Phase 3 will span 44.65 km with 31 elevated stations across two corridors. The exercise is estimated to cost ₹17.57 crore and take a year.