CIDCO has invited tenders for a 25.287-km, six-lane elevated corridor connecting Thane with Navi Mumbai International Airport. Estimated at ₹6,027.58 crore, the toll-funded PPP project aims to cut travel time from over 90 minutes to just above 30 minutes. Construction is expected to take three years after contractor selection.