Construction of 1st cable-stayed rail bridge underway in J&K, video out

India will get its first cable-stayed railway bridge by May on Jammu and Kashmir's Anji river, Northern Railway officials said. The trains will run at a speed of 100 kmph on the bridge, which is designed to withstand wind speed of 213 kmph. The trains will be stopped if wind speed goes beyond 90 kmph.

Load More