Fed up with delay, villagers build approach to Dhabota bridge
After months of delay in repairing the Dhabota bridge on the Punjab-Himachal Pradesh border, residents on Monday laid a makeshift approach to one end of the under-construction structure, allowing light motor vehicles to resume movement. Residents used trailers to transport tonnes of muck and cut stones to create the temporary approach from the road to the bridge.