Ganga Expressway to be completed by February 2026: UP CM
While reviewing the Ganga Expressway project, Uttar Pradesh CM Yogi Adityanath directed that construction work be completed by the end of February 2026. He said the 594-kilometre-long expressway would significantly strengthen the state’s connectivity and serve as a strong foundation for industrial, agricultural and logistics activities.