Mumbai Monorail project finally kickstarts with 19.54 kms line
Mumbai Monorail is set to resume operations after being shut since September 2025 due to technical failures. Upgraded with new trains, CBTC signalling, and safety certifications, services may restart by April-May 2026. The relaunch aims to improve reliability and integration with metro lines, giving the monorail a second chance to become a key part of Mumbai's transport system.