NTPC plans to achieve 30 gigawatts of nuclear energy capacity by 2047, with sites identified in Madhya Pradesh, Bihar, and Odisha. The state-owned firm also targets 244 GW total installed capacity by 2037, expanding clean energy operations across 14 states.