The National Highways Authority of India (NHAI) has formally begun the land collection process across 17 districts of the state, indicating the start of ground-level work on the prestigious Shamli–Gorakhpur corridor. The 742-km open-air access-controlled expressway, estimated at around ₹40,000 crore, is planned as a key west-to-east speed corridor that will cut travel time.