Seven out of the eight Regional Rapid Transit System (RRTS) stations in the Ghaziabad district will have footbridge facilities for passengers and regular pedestrians, the National Capital Region Transport Corporation (NCRTC) has said. The 82-km-long RRTS project, pegged at ₹30,274 cr, will link Delhi, Ghaziabad and Meerut with a high-speed train network with a design speed of 180 km/h.